Trimble Yard Visit Portal

Yard booking made easier for carriers

A simpler way to schedule and manage yard visits.

Give carriers an intuitive, unified platform with flexibility to book, manage and update yard appointments with ease.

Decoration image
Truck driver using a mobile device with Yard Visit Portal appointment booking interface for TMS-integrated yard scheduling.
BENEFITS

Single, intuitive platform for carriers

Designed specifically with carriers in mind, Yard Visit Portal tackles fragmented booking methods, limited control over time slots and the lack of a centralized view.

As a carrier, you get:

  • An intuitive platform with greater booking control
  • Greater information transparency
  • The ability to integrate with your existing TMS
LEARN MORE
Yard Visit Portal interface showing dynamic real-time planning with capacity groups and live appointment breakdowns.
BENEFITS

See all partners in one view

Gain greater control over your logistics network with Route Manifest. Bringing all route information and critical details into one intuitive view eliminates fragmented data and the need to switch between systems.

  • All route information consolidated in a single platform
  • Minimize manual errors and ensure data integrity
  • View critical details in real-time for faster decision-making
LEARN MORE
Time Slot Management interface displaying transport orders, delivery schedules and yard appointment booking workflows.
BENEFITS

Flexible driver & vehicle assignment

Book yard time slots without having every detail confirmed upfront. Driver, vehicle and other required information can be added or updated before arrival, giving carriers greater flexibility as plans change.

  • Adapt quickly to changing demands with flexible assignment
  • Maximize asset utilization and prevent bottlenecks
  • Free up dispatch teams to focus on more important tasks
LEARN MORE
Yard Visit Portal interface showing route manifest details, booked slots and carrier appointment scheduling support.
BENEFITS

Book directly from your TMS

Create and manage yard appointments directly from your existing TMS with our real-time appointment API. Save time, reduce errors and keep appointment information up to date.

  • Schedule dock appointments
  • Update required information for existing appointments
  • Add purchase orders to an appointment
  • Delete existing appointment
LEARN MORE

Features for easier yard bookings

Designed around carrier workflows

Built from the carrier’s perspective, Yard Visit Portal provides an intuitive scheduling experience designed around the way carriers and dispatchers actually work.

Essential yard information upfront

Give carriers the information they need before arrival, including relevant yard details and Health & Safety requirements, helping drivers arrive better prepared.

Add purchase orders in one click

Dispatchers can quickly add purchase orders to their Route Manifest in Yard Visit Portal with a single click, making it easier to keep critical shipment information together.

Clear location information with Trimble Maps

Trimble Maps integration gives carriers clear, easy-to-understand location information, helping them identify where they need to go for each yard visit.

A smarter way to manage yard appointments

Make yard appointment management easier for carriers and dispatchers, with flexible slot booking, simpler scheduling and greater control over driver and vehicle assignments to help maximize fleet utilization.